본문 바로가기 주메뉴 바로가기

The World Leader inEnergy Plant TechnologyWe provide the best quality energy equipment with the best engineering and services.

  • PR Center
  • Boiler Retrofit References

Boiler Retrofit References

Back

DAVE JOHNSTON UNIT 3

  • Owner PacifiCorp
  • Contractor
  • Start Up after Retrofit 2010

This boiler is a 300 MW Babcock & Wilcox PC Fired boiler equipped with twenty-four (24) BHI FW Vortex Series/Split Flame (VS/SF) Low NOx Burners (LNB) and Overfire Air (OFA).  Originally, the unit was configured in a “Cell” arrangement – the burners arranged with four (4) clusters of three (3) burners on both the front and back wall.  BHI FW redesigned the burner spacing on the front and rear walls to be more consistent with a traditional PC unit – four (4) columns of three (3) rows on each wall.  The coal piping was re-engineered and supplied by BHI FW along with all associated boiler and platform steel necessary.  The Unit has been successfully operating meeting contractual emission and boiler performance guarantees for seven years.


The unit fires low sulfur Powder River Basin (PRB) coal.

PR Center